Current
Projects: |
 |
|
|
Mondawmin Meter Room #1 - Baltimore |
|
Mondawmin Meter Room #1 is a phased design/build project to completely replace existing electrical equipment and upgrade an existing electrical meter room at Mondawmin Mall. Phase 1 was completed in 2011. Phase 2 is scheduled to be completed in 2012 and Phase 3 in 2013. This meter room currently serves existing mall tenants. B&R, acting as the general contractor, along with managing all MEP/FP scope, has been tasked with this project that requires close coordination with the local power utility company and mall operations as this project impacts an "open for business" retail center. |
| |
|
|
| |
Energy Efficiency Consulting Services for Maryland Live! Casino at Arundel Mills - Maryland |
|
The Cordish Companies' (Cordish) selected B&R; Construction Services as it's Energy Efficiency Consultant for the MEP systems serving this 300,000 sf Casino facility and 1.5 mil. sf parking garage located in Hanover, Maryland.
Our responsibilities on this project are:
- Energy Efficiency consulting on the MEP systems (lighting, HVAC, domestic hot water, other) including: selecting the most feasible systems, coordination with the local utility company (BG&E;) for acquiring energy efficiency incentives, coordination with equipment vendors and installing contractors on competitive pricing negotiation along with equipment deliveries and installation schedules, develop detailed financial feasibility analysis and environmental impact evaluations (reduction of CO2 equivalent emissions) for all the energy conservation measures. Here are a couple of relevant examples of highly efficient systems that have been or are being installed on this project:
- The approximately 1,400 LED light fixtures used here, lower the parking garage lighting energy usage by 62% in comparison with the Metal Halide technology. This is not just an outstanding (energy) efficient project, but also a show case for LED lighting being feasibly implemented on a large scale 100% privately funded commercial development. Through an aggressive pricing negotiation with vendors, manufacturers and installing contractors, along with acquiring financial incentives through the BG&E; rebate program, this LED lighting project has a payback of 0 months.
- The Energy Efficient Chillers serving the 300,000 s.f. casino floor reduce the energy usage by 15% comparing with ASHRAE 90.1 2007 base line.
- Renewable Power Generation assessments for implementing a solar Photovoltaic system, including: sizing the system (approx. 1.5 MWh), assess the available incentives (federal, state, local, SRECs), assess the overall system feasibility (projected annual cash flows, NPV, IRR, simple payback, and other engineering economics evaluations), assess the system development opportunities (cash investment versus Power Purchasing Agreement/PPA).
|
| |
|
|
| |
Westfield Wheaton - Costco Renovation - Maryland |
|
Mechanical, Electrical, Plumbing and Fire Protection services for approximately 300,000 Square Foot Mall expansion including 150,000 square foot Upper Level Costco, 75,000 Square Foot Lower Level Retail, and 75,000 Square Foot covered Parking Garage. |
| |
|
|
| |
Snow Dome at American Dream Meadowlands - Heat Trace - New Jersey |
|
The project is being constructed to provide a path for water from snow melt on the roof of the indoor ski facility.
The installation includes approximately 2,000 feet of heat trace cable on storm drain piping, 8,000 feet of heat trace cable on the roof. There is a 300Kw emergency generator being added to provide power to heat trace cable in the event of a power outage. The 1.1 million dollar project is expected to be complete in August of 2012. |
| |
Heat trace cable being routed around storm drains on SnowDome roof. |
Power junction box mounted to snow rail on SnowDome roof. Power is distributed from junction box to heat trace cable. |
Panelboard with new circuit breakers for storm drain and rooftop heat trace cable. |
|
|
| |
Westfield Great Northern Food Court - Ohio |
|
This completed project was an expansion and renovation to the existing Westfield Great Northern shopping center to create a new dining commons. The 30,000 square feet, $10MM project provided a new modern Food Court which includes 12 new food tenant spaces, new dining commons, and new public restrooms. B&R Construction Services was the MEP/FP design/build contractor for the 9 month project. |
| |
|
|
| |
Government Facility in Baltimore County - Maryland |
|
B&R; Construction Services has been tasked by a property developer to take over the position of Engineer and Construction Manager of record for the MEP systems of a new government owned campus located in Baltimore County, Maryland. The scope of work includes but is not limited to site wet and dry utilities, complete MEP Engineering and Construction Management services including highly efficient Energy Systems, on-site Renewable Power Generation (solar photovoltaic and thermal, wind, and geothermal), on-site Energy Storage, Rainwater Harvesting and Gray Water systems, heating and Cooling Central Plant, and special systems. This project is targeting LEED © Platinum and Energy Star certifications.
Because the project has not had an official press release yet, for the purpose of this web site presentation, we have only provided a generic project scope of work outline, along with a not fully scope specific rendering. |
| |
|
|
|
| |
"Latisys" Data Center - Maryland |
|
B&R; Construction Services has been awarded the role of Engineer and Construction Manager of record for the MEP systems of this Data Center located in Ashburn, Virginia. The scope of work includes but is not limited to site utilities, complete highly Energy Efficient MEP engineering services/systems, large capacity of on-site Emergency Power Generation, UPS, Fire Alarm and other Life Safety and Special Systems.
Additionally, we provided Life Cycle Analysis, Commissioning services, and Feasibility Consulting regarding the opportunity to implement on-site Renewable Power Generation, and assess the opportunity for Energy Star © and LEED © certifications. |
| |
|
|
| |
"Village South" Development - Maryland |
|
We are the Design Build Engineers and Construction Managers of record for the Mechanical, Electrical, and Plumbing (MEP) Systems of this 80-acre, over 1,000,000 new square feet of integrated retail, office and residential mixed use development. We are also engineering and construction managing the Life Safety and Special Systems on this project. Our scope of work includes but is not limited to site dry utilities, complete Energy Efficient MEP engineering services/systems, on site Emergency Power Generation, UPS, Fire Alarm and other Life Safety and Special Systems. Additionally, we provide Life Cycle Analysis, Commissioning services, consulting regarding the opportunity to implement on-site Renewable Power Generation, and assess the opportunity for Energy Star © and LEED © certifications. |
| |
|
|
|
|
|
|
|